As part of the upgrade to the Bayfair Shopping Complex. Draft It was commissioned to provide the shop drawings for the Countdown, Retail Shopping & United Cinema structures.

The countdown consisted of 154T of structural steel

The retail zone which joins the countdown to the old structure consisted of 333T of structural steel.

The cinema complex with all the acoustic isolating requirements consisted of 535T of structural steel including 50T structural steel required to support the surrounding buildings.

The project is due for completion in late 2019